The Contracted Power Optimization feature allows you to calculate the potential tariff optimization for each of your main electricity meters. In your single-site syntheses, a dedicated widget enables you to display the possible optimization for each meter. Some indicators are now also available for multi-site use.


Calculation Principle


The available indicators are calculated independently for each eligible electric meter (you can find all the prerequisites for tariff optimization calculations in this article). Calling these indicators in a multi-site context aggregates the results obtained for all delivery points within the selected perimeter.

Since the contracted power optimization calculation is always performed annually, the indicators provide a single annual result based on the consumption of the previous 12 months. In a multi-site context, these results are updated monthly (and in real time for single-site) for the previous 12 complete calendar months. For example, in March 2024, your multi-site indicator will return a result based on consumption from March 1, 2023, to February 29, 2024.

These indicators only work in "indicator," "distribution," and "Other" category table widgets.


Multi-Site Available Indicators


List of Available Indicators:


Current Fixed Portion - Contracted Power Optimization
Current Variable Portion - Contracted Power Optimization
Current Exceedance Portion - Contracted Power Optimization
Current CTA Cost - Contracted Power Optimization
Current TCFE Cost - Contracted Power Optimization
Current Total Cost - Contracted Power Optimization
Optimized Fixed Portion - Contracted Power Optimization
Optimized Variable Portion - Contracted Power Optimization
Optimized Exceedance Portion - Contracted Power Optimization
Optimized CTA Cost - Contracted Power Optimization
Optimized TCFE Cost - Contracted Power Optimization
Optimized Total Cost - Contracted Power Optimization
Fixed Portion Difference - Contracted Power Optimization
Variable Portion Difference - Contracted Power Optimization
Exceedance Portion Difference - Contracted Power Optimization
Difference on CTA - Contracted Power Optimization
Difference on TCFE - Contracted Power Optimization
Potential Gain - Contracted Power Optimization (fixed result for the last 12 complete months)